• Test the chiller for the conditions it will actually operate in.

    Independent FAT for chillers and chilled water equipment before it leaves the factory.

Test more than one operating point

A chiller can pass a factory test at one operating condition. That does not show how it will perform at the different loads, water temperatures and operating points it will see during the year. Independent FAT verifies the equipment against the specified requirements before it leaves the factory.

If the chiller is specified for 2 MW of cooling at a stated chilled water flow, return water temperature and entering condenser water temperature, we test it.

If it is specified to turn down to 10 percent load, we test that too.

A factory acceptance test is also one of the last opportunities to identify problems while the equipment is still at the manufacturer. After shipment, the same problem can affect commissioning, project schedules and site costs.

Independent chiller testing before shipment

Specified conditions tested

We test the chiller against the manufacturer's specifications and the end user's requirements. This includes the specified cooling capacity, water flow and water temperatures.

Different operating points

We test more than one operating point. This includes different loads, water temperatures and specified turndown conditions.

Independent verification

We verify that the equipment being supplied can meet the specified requirements before it ships.

Documented test results

We document the tests, operating data and findings. You receive a clear report that you can give directly to your client.

How the FAT works

Talk with us

We get on a call to discuss the equipment, the FAT and whether we can help or should send you to someone better suited.

Review the requirements

We review the manufacturer's specifications and the end user's requirements before the FAT.

Attend the factory test

We attend the FAT at the factory and verify the equipment against the specified requirements. You can attend with us, or we can represent you.

Get the report

We document the tests, operating data and findings in a clear report. You can give the report directly to your client.

Chilled water system diagram from our report to the client, offshore Norwegian Continental Shelf

References

See our References page for examples of real offshore and industrial projects we have worked on.

Independent chiller verification

We provide independent factory acceptance testing for chillers and chilled water equipment. We verify the equipment against the manufacturer's specifications and the end user's requirements, then report the findings to you. Your customer stays your customer.

Common questions

We independently verify the equipment against the manufacturer's specification and the end user's requirements before it ships. Testing is carried out at more than one operating point, including part load and different water temperatures.

Yes. The FAT covers more than one operating point, including part-load operation and different water temperatures. The results are checked against the manufacturer's specification and the end user's requirements.

Yes. We can represent the contractor at the factory for the FAT. Alternatively, your team can attend with us.

Yes. We document the tests, operating data and findings. You receive a clear report that you can give directly to your client.

We report the findings to the contractor. The contractor decides what happens next.

We work for the contractor and are independent of the equipment manufacturer. We do not sell chillers, compressors, equipment or parts.

Verify the chiller before shipment