• Stabilize Data Center Cooling

    Witness testing, maintenance planning, chiller optimization, liquid server cooling.

Redundancy verified 

Every design says N+1. The question is whether the plant behaves that way at three in the morning, when a chiller drops out and nobody is on site. We come in as an independent pair of eyes and either prove it or show you where it breaks.

Concurrent maintainability: walking the plant valve by valve to confirm you can isolate and service any single item without dropping the load

Capacity and redundancy verified against the actual IT load, not the day one design load

Witnessed load bank testing, including failover from utility to generator with the cooling plant running

Chilled water temperature and flow strategy, and where you are giving away efficiency to hold a set point nobody needs

Control and sequencing review: staging, lead lag, and what the plant actually does when a chiller trips

Water treatment, glycol concentration and strainer condition, which is where slow capacity loss usually starts

We do not sell equipment and we hold no maintenance contract on the site, so the findings are independent. The report is written to be handed straight to the client or the board without translating it first.

Cooling performance independently verified

Redundancy verified

We verify capacity and redundancy against the actual IT load. We check what the plant does when a chiller trips.

Maintainability checked

We walk the plant valve by valve to confirm whether a single item can be isolated and serviced without dropping the load.

Testing witnessed

We witness load bank testing, including failover from utility to generator with the cooling plant running.

Plant operation reviewed

We review chilled water temperature, flow, staging, lead lag, water treatment, glycol concentration and strainer condition.

How the cooling review works

Talk with us

We get on a call to discuss the data center cooling plant and whether we can help or should send you to someone better suited.

Review the information

We review the design, actual IT load and available operating data.

Check the plant

We walk the chilled water plant and witness testing on site. We check how the cooling plant operates under the required conditions.

Get the report

We document the findings in a clear report written to be handed directly to the client or the board.

Chilled water system diagram from our report to the client, offshore Norwegian Continental Shelf

References

See our References page for examples of real offshore and industrial chilled water projects we have worked on.

Independent data center cooling review

We do not sell equipment and we hold no maintenance contract on the site. Our findings are independent. We document what we find and report it to you.

Common questions

Yes. We verify capacity and redundancy against the actual IT load, not the day one design load. This checks the chilled water plant against the load it is actually supporting.

We walk the plant valve by valve to confirm you can isolate and service any single item without dropping the load.

Yes. We witness load bank testing, including failover from utility to generator with the cooling plant running. We also review the control and sequencing of the cooling system.

Yes. Control and sequencing review is part of the data center cooling work, including staging, lead lag and what the plant does when a chiller trips.

Yes. We check water treatment, glycol concentration and strainer condition, which is where slow capacity loss usually starts.

Yes. We work for the contractor, report our findings to the contractor, and do not approach your client for service work. You decide what happens next, and your team carries out the work.

Verify your data center cooling

Get a quote for an independent review of your data center chilled water plant.