• Commission the complete chilled water plant.

    New chillers and chilled water systems started, balanced, controlled and proven against design.

As hands on or hands off as the project needs

We can commission the plant with your team, or independently verify the completed work.

Hands on, we set bypass valves and pump speeds, balance the chilled water system and the chillers, and work with the automation contractor to set up staging across multiple chillers.

If a control panel or control sequence is not working as required, we work with the controls contractor to correct it.

Hands off, we verify that the chillers and chilled water system are balanced, controlled and operating as designed. We document the results.

If the sequence of operations does not work correctly, we develop a revised sequence.

If the plant matches the drawings and specifications but still does not operate correctly, we document that too. We identify the problem and propose changes to the control strategy.

Commissioning is complete when the chilled water plant works under the conditions it was designed for.

At handover, your client gets an operating plant and a written record showing what was tested and verified.

A plant proven against design

System balancing

We set bypass valves and pump speeds, and balance the chilled water system and the chillers.

Controls and staging

We work with the automation contractor to set up staging across multiple chillers. If the controls are not working as required, we work with the controls contractor to correct them.

Independent verification

We can independently verify that the chillers and chilled water system are balanced, controlled and operating as designed.

Documented results

We document what was tested and verified. At handover, your client gets an operating plant and a written record.

How commissioning works

Talk with us

We get on a call to discuss the chilled water plant, what is going on and whether we can help or should send you to someone better suited.

Review the project

We review the drawings, specifications and commissioning plan.

Commission the plant

We work on site with your team, or independently verify the completed work. We check that the chillers and chilled water system are balanced, controlled and operating as designed.

Document the handover

We report the results and provide a written record showing what was tested and verified at handover.

Chilled water plant diagram from our report to the client, industrial plant in Denmark

A new plant that could not pass its air test

See how we brought a new industrial chilled water plant in Denmark through commissioning and handover after it could not pass its under 4 percent air requirement, with a permanent air separator keeping it there.

Independent chilled water commissioning

We can commission the plant with your team or independently verify the completed work. We document the results and report them to you. Your customer stays your customer, and you decide what happens next.

Common questions

We commission the chilled water plant as a complete system. The new plant is started, balanced, controlled and proven against the design.

Yes. Our commissioning role can be hands on or hands off. Your team remains responsible for the work, and we work for you as the contractor.

We work across the chilled water system rather than treating the chiller in isolation. We set bypass valves and pump speeds, balance the system and chillers, and work with the automation contractor on staging.

We can develop a revised sequence of operations where the existing sequence does not work. We then work with the automation contractor on the plant staging.

We report our findings to the contractor. You decide what happens next and what is communicated to the client. The report can be handed to the client under your own company name.

Yes. Your team carries out the work. Our role can be hands on or hands off depending on how you want us involved.

Get the plant through commissioning

Get a quote for chilled water commissioning or independent verification.